Field problems. What the line is doing, where it happens and what to check first.
Each problem names the industry and the stage where we see it. Open one for the causes, the checks and the fix.
When a final membrane loads long before its expected life, the cause is often the pre-filter upstream, sized for a micron rating without allowing for the dirt load it sees.
Precious metal catalyst passes into the filtrate when a bag bypasses at the seal or tears at change-out.
Operators come into contact with the bag, the housing and the process liquid each time a line is opened.
Condensate reaches a hydrophobic vent filter and restricts tank breathing.
Cartridges need changing every few days instead of the expected months.
A pre-filter is sized first for the dirt load it will carry, then checked for micron rating.
Fines and colour pass the carbon stage and appear downstream.